"Copy" on each event card opens the event editor filled in from that
event (campus, sessions, options, variants, early birds, sections, form,
recipients, feedback questions, certificates, reminders). "New start"
moves every date with it. Allocation groups and, for admins, planned
costs are copied by POST /api/events/:id/copy-from. Registrations,
coupons, attachments, kids check-in and volunteer roles are not copied.
Roadmap: event series and cloning ships as 1.47.0-1.47.3.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Client-facing release notes the Hub reads from git with the version tags, so
the latest version and its notes reach installs without touching the Hub.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
There's no Actions runner (no machine that can run Docker), so every push
left a run stuck on "Waiting". Tests and lint are run by hand before a
release, and releases are deployed with scripts/deploy.sh on the server.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Site settings -> Campuses tab; campus picker in the event editor; campus
filter and badges on the events list, public events page (remembered,
starts on home campus) and reports/dashboards; /campus/<slug> pages and
sitemap; home campus on the profile; "Everyone at a campus" in email and
WhatsApp broadcasts. Help, FEATURES, SETTINGS, API docs, protocol doc
(campusCount), handover and roadmap updated; campuses seeded for e2e.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
PRODUCTION_PUBLIC_KEY is the key the production Hub serves at
/api/public-key, normalised to PEM, so installs no longer need
HUB_PUBLIC_KEY. Test covers the built-in key with the env var unset.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Site settings -> Licence sends a signed update request to the Hub
(docs/hub-protocol.md 3a) instead of showing bash scripts/deploy.sh. Shows
"Update requested" until the site runs that version and hides the update
banner meanwhile. Audit-logged as hub_update_requested.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The deploy's next build fails on react/no-unescaped-entities. Bump to
1.37.3; the handover now says to lint the whole frontend before tagging.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Timed jobs move from in-process timers to a job registry run by pg-boss:
once per schedule across processes, retries, run history, cron schedules
in the church timezone, and an admin Background jobs page with Run now.
Playwright end-to-end tests run against their own seeded database. A
Gitea Actions workflow runs backend tests, frontend checks and the e2e
tests, and deploys v* tags with scripts/deploy.sh once secrets are set.
Also fixes the at-the-door check-in count for multi-day tickets.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
npm run set-demo wipes the database, keeping the site settings and the
admin account, and stages six upcoming events with registrations,
payments, tickets, a waitlist, camp cabins, coupons, costs and funnel
stats for showing the platform to other churches. Documented in
backend/DEMO_DATA.md.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Prisma 5.22 -> 7.10 using the @prisma/adapter-pg driver adapter; the
datasource URL moves to backend/prisma.config.js. All clients are built
in src/config/db.js, and index.js reuses the shared client.
- Backend: patch follow-redirects, drop nodemon for `node --watch`, and use
js-yaml 4 for the Jest coverage loader. npm audit reports 0.
- Frontend: override postcss-selector-parser to 7.1.7 (Tailwind 3 output
is unchanged). braces has no patched release and stays, build/lint only.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>